👉Construction Engineering Abbreviation Tips

➡️The common abbreviation used in Construction Industry

👷 A.A.S.H.T.O – American Association of state highway Transport Official.

👷 A.C.I – American Concrete Institute.


👷 A.R.E.A – American Railway Engineering Association.

👷 A.B – Anchor  Bolt Or Asbestos Board

👷 AC – Asphalt Concrete

👷 A.S.C – Allowable Stress of concrete.

👷 A.S.T.M – American society for testing materials

👷 AC – Asbestos Cement.

👷 AE – Assistant Engineer

👷 APM – Assistant Project Manager

👷 B.M – Benchmark

👷 B.M – Bending Moment.

👷 BLK – Block Work

👷 BOQ – Bill Of Quantities

👷 BRW – Brick Retaining Wall

👷 BWK – Brick Work

👷 B.O.F – Bottom Of Foundation

👷 BHK – Bedroom, Hall, Kitchen

👷 C.I.Pipe – Cast iron pipe.

👷 C.I.Sheet – Corrugated Iron sheet.

👷CL- Centre Line

👷CRW – Concrete Retaining Wall

👷 CBW – Concrete Block Wall

👷 CIP – Cast In Place

👷 CMU – Concrete Masonry Unit

👷 CJ – Construction Joint

👷 CC – Centre To Centre

👷 CC – Cement concrete.

👷 CE – Chief Engineer

👷 CP – Cement plaster.

👷 CPM – Critical path method.

👷 CS – Comparative statement.

👷 D – Diameter

👷 DL – Development Length

👷 Dia – Diameter

👷 DIM – Dimension

👷 D.L – Dead load.

👷 DPC – Damp proof course.

👷 DPR – Daily Progress Report

👷 DRG – Drawings

👷 DWLS – Dowels

👷 EJ – Expansion Joint

👷 E.L – Environmental load.

👷 EL – Existing Load

👷 EGL – Existing ground level.

👷 ELCB – Earth Leak Circuit Breaker

👷 F.M – Fineness Modulus.

👷 Ft – Foot Or Feet

👷 FL – Floor Level

👷 FGL – Formation ground level.

👷 FOC – Factor Of Safety

👷 GL – Ground Level

👷 GL – Ground level.

👷 GP – Ground plane.

👷 HFL – Highest Flood Level.

👷 HAC – High Alumina Cement

👷 HP – Horizontal plane.

👷 IOM – Inter Office Memo

👷 ISI – Indian standard institute.

👷 JE – Junior Engineer

👷 JST – Joist

👷 Kg  – Kilogram.

👷 L.L – Live load.

👷 LW – Light  Weight

👷 LWC – light Weight Concrete

👷 LC – Lime concrete.

👷 M – Meter

👷 MM – Millimeter.

👷 MB – Measurement book.

👷 MCB – Miniature Circuit Breaker

👷 MEP – Mechanical Electrical Plumbing

👷 MFL – Maximum Flood Level

👷 MRC – Material Receipt Challan

👷 MT – Metric Tonnes

👷 N – Newton

👷 NCF – Neat cement finishing.

👷 OPC – Ordinary Portland Cement

👷 OGL – Original ground level.

👷 OSR – Open Soace Reservation Area

👷 PC – Pile Cap

👷 PC – Precast Concrete

👷 PCC – Plain Cement Concrete

👷 PERT – Programme Evaluation and Review Technique.

👷 PL – Plinth level.

👷 PM – Project Manager

👷 PO – Purchase Order

👷 PPE – Personal Protective Equipment

👷 PPR – Poly Propylene Random.

👷 PVC – Poly vinyl choloride .

👷 PVC – Polyvinyl Chloride

👷 PSF – Pound Per Square Foot

👷 PSI – Pound Per Square Inch

👷 PWD – Permanent Works Engineer

👷 QC – Quality control

👷 QS – Quantity Surveyor

👷 RC – Reinforced Concrete

👷 R.B.W – Reinforced brick work.

👷 RBC – Reinforced Brick concrete.

👷 RCC – Reinforced Cement Concrete

👷 RMC – Ready Mixed Concrete concrete.

👷 RL – Reduced level.

👷 SCC – Self Compacting Concrete

👷 STP – Sewage Treatment Plant

👷 SRC – Sulphate Resisting Cement

👷 SWG – Standard wire gauge.

👷 TB – Tie Beam

👷 TBM – Tunnel Boring Machine

👷 TDS – Total Dissolved Solids

👷 TOB – Top Of Beam

👷 TMT – Thermo Mechanical Treatment

👷 TOC – Top Of Concrete

👷 TOW – Top Of Wall

👷 U.S.C – Ultimate stress of concrete.

👷 UPVC – Unplasticized Polyvinyl chloride.

👷 USD – Ultimate strength design.

👷 VP – Vertical plane.

👷 W.C – Water closet.

👷 WL – Working Level

👷 W.S.D – Working stress Design

👷 WO –  Work Order