Third and final orbit manoeuvring of EOS-05 (GISAT-1A) spacecraft… — Indian Development News 🇮🇳 — TG.ME

Indian Development News 🇮🇳#UPDATE: The second operation to raise the apogee of EOS-05 was completed successfully at 7:00 pm on September 06, 2026. The LAM engine fired for 338.9 seconds and the estimated apogee after manouever is 35786 km. The satellite health is normal. #ISRO #Space
Third and final orbit manoeuvring of EOS-05 (GISAT-1A) spacecraft completed.

The third and final orbit raising manoeuvre to increase the perigee of EOS-05 completed successfully at 8:57 pm on September 07, 2026.

The LAM engine fired for 1247 seconds and the estimated orbit after manouever is 34903 km x 35884 km.

The satellite health is normal.

#ISRO #Space
👍42❤11🫡6
September 7, 2026 1.3K 1 6