
BARC is partnering with Reliance, Adani, NTPC, and L&T to build a ₹9,000‑crore 300‑MW modular reactor through a special purpose vehicle, with an RFP expected soon, as part of India’s plan to reach 100‑GW nuclear capacity by 2047 from the current 8.7 GW. #Nuclear
46
4
3
2September 18, 2026 1.5K 19