⭕️How I prepare a price/cost for a project?⭕️
When I start pricing a project, I follow a simple principles so nothing slips through: Here we goo
👉1. Understand the design
I go through the drawings and specs first. If I don’t understand the work, the numbers won’t make sense.
👉2. Break the project into work items
Concrete, masonry, plaster, tiles, paint, etc. I list everything clearly so the BOQ flows in a logical order. You can use sample BoQ
👉3. Take off quantities
I measure all items from the drawings. Accuracy here saves headaches later.
👉 4. Apply unit rates
I build rates based on:
🔸 Material price
🔸 Labor cost
🔸 Equipment/transport if needed
🔸Small overhead allowance
👉I also compare with past projects or market rates to make sure the pricing is reasonable.
6. Add contingency
🔶Construction always has surprises. A small buffer keeps your estimate realistic.
🟡Good BOQ + clear pricing = confidence before starting work.🟡